MMM106

Educational Website

Home

join us

News

Vlogs

MMM team

second web

1. What is a cleanup job?
When can we say that a cleanup job is finished?

p5

A cleanup job is flowing the well to eliminate all foreign fluid (mud filtrates, completion fluid, acid contaminated fluids and debris etc..), contained in the invaded zone and the wellbore so that representative reservoir fluids can be represented. Estimation of duration of cleanup job:

  • A.BS&W 1% solids
  • B. Salinity measurement of water if any: Water not coming from the formation BS&W must be less than 1% to consider clean up finished . If formation water is being produced there is no limit in BS&W to consider that clean up achieved.
  • C. PH is 7 after acid job
  • D. Stabilization of WHP and BHP
  • E. Visual examination of the flare: white or gray smoke indicate the presence of water.
  • F. At least the well bore volume has been produced: (tubing content and rathole content)
  • G. Surface flow rate stabilization

2. What is De-oiling job?

p5

  • Rig up re-injection line and cleaning it by pumping seawaer from one side and on the second side there is a boat to calcualate the total pumped water and to get sll the debris

2. .

p5

Chapter Test